On the same area, an underground cable conduct receives from 150 meters away on the water oil crude vessels , position at the river, to transport to the airport , the fuel.
you can see the operation when its being refuel, bcz the vessels are position at the river, 150 meters away with cables connecting to ground at the port
No comments:
Post a Comment